Jobing.com Arena-Crown Castle $398,400 Project Complete Date 9/30/16

  • Install 1600ft of 24 strand SM fiber optic cable to (4) customer designated locations
  • Terminate, test & label (96) SM fibers (192) Install (8) customer provided fiber optic LIU’s
  • Install (364) RAU/REU locations with engineer suggested unistrut/plywood combination support.
  • Install (104) directional antennas and (183) [MIMO] OMNI antennas
  • Install 11000ft of 1/2″ AirCell Plenum Cable at locations designated on prints.
  • Install (460) segments of fiber=96,760ft for RAU/REU to ICU connectivity
  • (1200) fiber splices for MPO connections
  • Head ends for Crown Castle, Verizon, At&T & Sprint